Pictures of Radon Reduction Mitigation Installations in Elliot Lake, Ontario 

 
Sump Pit Depressurization System

Pre-mitigation 707.4 Bq/m3 Post mitigation 64.03 Bq/m3 91% Reduction in radon levels.